Trending Today ...
Letter to the Editor
Permanent daylight savings time or Tulsa time?

Dear Editor, We have been seeing and hearing

Karaoke at Kathryn Heidenreich Adult Center

KINGMAN — Residents recently enjoyed karaoke at the

judge bench
Petersen convicted after assaulting woman with crock pot

KINGMAN, Ariz. – A Kingman man could be

Build a career, not just a resume: Mohave

MOHAVE COUNTY - A successful future does not require

courtroom
Bullhead City elder abuse plea rejected

KINGMAN, Ariz. – A convicted sex offender residing

plant
The dream of sowing mid-summer desert edibles

From the low to high deserts of Mohave

Thank you for reading The Standard newspaper online!

Asphalt pavement repairs on Oro Grande Blvd

BULLHEAD CITY – In an effort to increase the safety of traveling motorists and improve the quality of our roads, Lake Havasu City announces the asphalt pavement roadway repairs on Oro Grande Blvd. This two day closure results in additional cost savings to the City and an accelerated completion time to get motorists back on the road.as soon as possible. Work is scheduled to occur between 5 a.m. and 5 p.m. on Tuesday, June 16th through Thursday, June 18th, 2020 subject to weather and other conditions. The work will require Oro Grande Blvd. from McCulloch Blvd. to Osage Dr. to be closed. Motorists are encouraged to find alternate routes, allow themselves extra travel time and follow all construction signage.

Thank you for your assistance and as always, please exercise caution when driving through any construction area. Questions can be directed to the Maintenance Services Division, Public Works Department for Lake Havasu City at 928.855.3377.

Leave a Reply

Your email address will not be published. Required fields are marked *