Trending Today ...
Real Deals Saves the Day for Cerbat Elementary

KINGMAN — The freezer in the teacher's lounge

Special spooky times at the Kingman Library

KINGMAN, Ariz. — Kids had a special story

Kingman Moose Lodge makes generous donation to ARC

KINGMAN, Ariz. - Moose Lodge 1704 in Kingman

Letter to the Editor
They leave in threes: Part Two

Dear Editor, A story about optimism and resilience

Art
Ribbon cutting set for Youth Advisory Council Mural

KINGMAN, Ariz. – The City of Kingman invites

obituary
Bullhead City announces opening of Peaceful Paws Pet

BULLHEAD CITY, Ariz. - The City of Bullhead

Thank you for reading The Standard newspaper online!

Nighttime work for water main replacement at Acoma from Havasupai to Bahama

LAKE HAVASU CITY – Lake Havasu City continues moving forward with essential infrastructure improvements along Acoma Boulevard West, from Havasupai Boulevard to Bahama Avenue. This work supports ongoing roadway improvements and water main upgrades.

A detour is in place from 8 p.m. to 5 a.m .on Monday, May 18, through Tuesday, May 19, to complete the water main work through the intersection. Please use the detour for your commute.

Motorists may experience periodic delays. Drivers are encouraged to allow extra travel time and follow all posted traffic control signs throughout the construction period.

Lake Havasu City appreciates the public’s patience and cooperation as these improvements enhance roadway safety and strengthen the City’s infrastructure.

For additional information and to view detour maps, please visit the City’s website at https://www.lhcaz.gov/public-works/street-projects