
The Arizona Department of Transportation advises motorists on Interstate 40 to plan ahead and be prepared to merge into open travel lanes near Seligman at the Interstate 40B overpass bridge (Exit 121) near Seligman while new bridge deck construction is underway. The work will require the following restrictions:
- Alternating full lane closures of east- and westbound I-40 are scheduled from 5 a.m. to 4:30 p.m. Saturday, April 6. Detours: Traffic will be diverted to the Exit 121 on- and off-ramps for both east- and westbound traffic. The speed limit will be reduced to 35 mph through the work zone.
- East- and westbound I- 40 will be reduced to one lane between mileposts 120 and 122 (right lane closed). The speed limit will be reduced to 55 mph through the work zone.
- A 20-foot vehicle-width restriction will also be in place.
Drivers should proceed through the work zone with caution, slow down and watch for construction personnel and equipment. For more information about the project, please visitazdot.gov/I40bWSeligmanBridges
Schedules are subject to change based on weather and other unforeseen factors. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or go to azdot.gov/contact and select Projects from the drop-down menu. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.