Trending Today ...
Letter to the Editor
Standard deemed unprofessional

Dear Editor, I am writing it as a

Letter to the Editor
Halloween costumes and political candidate’s masks

Dear Editor, Halloween and the election are really

Letter to the Editor
We need more Christian leaders in office

Dear Editor, I firmly feel that we need

Letter to the Editor
They leave in threes

Dear Editor, They say sometimes they leave in

West Kingman Pharmacy joins statewide Narcan initiative 

KINGMAN, Ariz. - The West Kingman Pharmacy will

Century-old building being restored in Oatman

OATMAN, Ariz. – Kris Crawford bought the historic

Thank you for reading The Standard newspaper online!

Contract awarded for I-40/US 93 interchange project in Kingman

KINGMAN – The State Transportation Board has awarded a $106 million construction project to build a free-flowing traffic interchange for Interstate 40 and US 93 in Kingman.

With the contract awarded to Fisher Sand & Gravel Co. during the board’s meeting on Friday, March 15, construction is expected to begin this summer and take two and a half years.

The interchange in west Kingman is designed to reduce congestion on the highly traveled route between Phoenix and Las Vegas while improving safety, travel times and reliability. While vehicles now must stop at a traffic signal where Beale Street intersects with I-40, the system-to-system interchange will feature ramps that allow traffic to flow freely.

The interchange is designed to handle projected traffic growth for the next 25 years. 

Leave a Reply

Your email address will not be published. Required fields are marked *