Trending Today ...
london bridge
London Bridge Days Parade, Changes to Route and Road

LAKE HAVASU CITY, Ariz. – Lake Havasu City

Against the Odds: Education student turns hardships into

MOHAVE COUNTY – What could have been a

Mohave College women’s soccer hosts Eastern Arizona, Yavapai

MOHAVE COUNTY – The Mohave College women’s soccer

Mohave College men’s soccer hosts Eastern Arizona, Yavapai

MOHAVE COUNTY – The Mohave College men’s soccer

walk away from drugs
20th Annual Walk Away from Drugs & Keep Kingman

KINGMAN, Ariz. – The 20th Annual Walk Away

pirate dog costume
Monster Mutt Mash “26”

KINGMAN, Ariz. – The 3rd Annual Monster Mutt Mash

Thank you for reading The Standard newspaper online!

Plan for ongoing lane restrictions on I-40 near Arizona-California state line starting Sept. 12 for paving

Prepare for delays

The Arizona Department of Transportation advises motorists traveling on Interstate 40 near the Arizona-California state line to expect around-the-clock lane restrictions on a 2-mile segment of the interstate beginning Thursday, Sept. 12, through mid-October.

Drivers should be prepared to slow down and make frequent stops while the following restrictions are in place: 

  • I-40 will be narrowed to one lane in each direction roughly between mileposts 4 and 5. 
  • A 14-foot vehicle width restriction will be in place.
  • The speed limit will be reduced to 55 mph in the workzone.

This is the first of two I-40 paving projects near the state line that ADOT has initiated. The second project, between mileposts 0-2, will start later this year.

ADOT reminds drivers to proceed through the work zone with caution and watch for construction personnel and equipment while construction is underway.

For more information, visit the project web page