Trending Today ...
republican party logo
LBRW to meet Nov. 2

LAKE HAVASU CITY, Ariz. – The London Bridge

courtroom
West faces prison for fentanyl transport

KINGMAN, Ariz. - A Kingman man will serve

judge bench
Cobb takes plea in Body Beach assault

KINGMAN, Ariz. – A violent confrontation at Body

prescription drugs
National prescription drug take-back day

BULLHEAD CITY, Ariz. – The Bullhead City Police

masonic lodge
Masonic Lodge hosts open house

KINGMAN, Ariz. – The Kingman Masonic Lodge #22

Letter to the Editor
Silence May or May Not Be Golden

Dear Editor, Silence may or may not be

Thank you for reading The Standard newspaper online!

Striping to Begin on Various City Roads

KINGMAN – The City of Kingman will begin striping recently chip sealed roads Saturday, June 26 through Wednesday, June 30, 2021, weather permitting. During this time there will be travel delays and reduced speeds due to lane restrictions. The City of Kingman urges motorists to pay extra attention while driving in and around work zones, maintenance vehicles, and encourages the importance of maintaining safe and smart driving habits during the construction season, and at all times, when operating a motor vehicle.

Road striping:

  • Sunshine Drive and Rock Road
  • Burbank Street
  • Bank Street (Airway Avenue to Townsend St.)
  • North Stockton Hill Road (North of Gordon Drive to Stockton Hill Road City Limits)
  • Western Ave. Sycamore Ave, 6th St., Anson Smith Rd.
  • Fort Beale Dr.

Please use alternative routes if possible and obey slower speed limits in work zones. Up-to-date street closures will be located on the City of Kingman’s engineering website page of interactive Maps through the city’s Geographic Information Systems (GIS): https://www.cityofkingman.gov/government/departments/engineering/gis

Leave a Reply

Your email address will not be published. Required fields are marked *