Trending Today ...
Eric Olson Kingman Moose Lodge 1704 Valued Veteran

KINGMAN, Ariz. – Saturday night, Nov. 7, the

Bible
Decoding Prophecy: Countdown to Armageddon 

KINGMAN, Ariz. – Evangelist Mike Sady is teaching

KYAC unveils mural facing Mohave Wash in Kingman

KINGMAN — The 440-foot wall behind Walmart, facing

JAVC breaks ground for Liberty Commons veterans homes

KINGMAN, Ariz. – It had been a vision

GOP leaders turn on Turning Point over brutal

PHOENIX — Democratic candidates swept in Arizona’s midterm

arizona legislature
Arizona turns blue with first trifecta in six

PHOENIX — Arizona made history last week as

Thank you for reading The Standard newspaper online!

Bullhead City Municipal pool deck to be resurfaced 

The current concrete deck of the Municipal Pool has not been professionally resurfaced since the pool opened in 1992 

BULLHEAD CITY – The Bullhead City Municipal Pool deck is scheduled to receive substantial new maintenance for the first time since the pool was opened in 1992. The City entered a contract with JTR General Engineering Contractor LLC of Lake Havasu City to resurface and seal the pool deck and make drainage improvements to the facility, including installing two new French drains.  

“This is a Kool Deck,” said Bullhead City Public Works Director Angie Johnson, referring to the material that will be used to resurface the ground surrounding the pool. “It will be around the entire pool surface area, through the hallways, and also into the restrooms.”  

Kool deck is a concrete coating designed to prevent the surface from getting hot from direct sunlight during the summer. It is meant to be comfortable for walking on bare feet, be slip-resistant while wet, and look tasteful.  

“We’re excited that the pool deck is being professionally resurfaced,” said Bullhead City Parks and Recreation Superintendent David Heath. “A good pool deck provides better traction for little, wet feet, and the latest technology can cool the surface off considerably. That’s something that is much appreciated in our climate.” 

The pool will close January 21 for work to begin and is expected to reopen April 30 after work is completed.  

The $220,378.00 project was approved by council during the November 21, 2023 City Council meeting.  

Leave a Reply

Your email address will not be published. Required fields are marked *